Solar Permitting & Utility Interconnection in Bastrop & Fayette County, TX
Every residential solar install needs a permit and a signed utility interconnection agreement before it can legally turn on. We handle both — here's what the process actually involves.
Does Your Situation Sound Like This?
Texas law limits how much an HOA can restrict solar. Deed restrictions on setbacks or street-facing visibility may still apply — a county (and sometimes city) permit is still required either way.
Most of Bastrop and Fayette County has no HOA at all outside city limits. A county permit is still required regardless.
Mostly served by Bluebonnet Electric Cooperative. See your city's location page for the specific utility that covers your address.
Split between municipal utilities and Fayette Electric Cooperative. Depends on the specific city — see your city's location page.
Reasonable — timelines vary by utility. We give you a real estimate specific to your address rather than a single sitewide number.
Worth knowing what's involved first. Permit review, utility interconnection review, and Permission to Operate are three separate steps most homeowners underestimate.
A Permit and an Interconnection Agreement Are Not the Same Thing
The Permit Confirms Code Compliance
The permit — typically a county permit, and sometimes a city one depending on your exact address — confirms the installation itself meets electrical and building code. Texas's SB1202 also created a standardized third-party review process some jurisdictions use for solar permit review specifically, separate from a general building permit.
The Interconnection Agreement Is a Separate Process With Your Utility
This confirms your system can safely connect to the grid, and it isn't complete until the utility issues Permission to Operate (PTO) — the actual green light to turn your system on and start generating.
Which Utility Covers Your Property Is the One Genuinely Local Fact Here
Bastrop County properties are mostly served by Bluebonnet Electric Cooperative; Fayette County splits between municipal utilities and Fayette Electric Cooperative depending on the city — and each utility runs its own interconnection review timeline and requirements. Rather than repeat utility-specific detail here, that's covered on each city's own location page, since it's a fact that changes by address, not by which solar service you're getting.
Skipping Ahead Has Real Consequences
A system installed but not yet through PTO isn't authorized to export power to the grid, and running it prematurely creates a real safety issue — it can backfeed power into lines utility crews may believe are de-energized. We don't turn a system on until PTO is actually issued.
What This Process Actually Costs
Permit & Interconnection Fees
Fees vary by county, city, and utility, and are handled as part of your project rather than quoted as a flat sitewide number.
Federal Tax Credit
The federal Residential Clean Energy Credit ended for systems installed on or after January 1, 2026 (One Big Beautiful Bill Act, per IRS FS-2025-05). Older marketing referencing a 30% federal credit is outdated.
Texas Property Tax Exemption
Still active. Texas Tax Code §11.27 exempts the added value of a solar energy device from your home's appraised value — filed via Form 50-123 with your county appraisal district (Bastrop CAD or Fayette CAD) after installation, once PTO is issued.
Permitting & Interconnection FAQ
Serving Bastrop & Fayette County
See your specific city's location page for which utility and permitting authority covers your address, or the full Residential Solar Panel Installation overview.